LandUp develops modular data center capacity for near-metro, low-latency compute — typically under 50 MW — with grid or behind-the-meter power, deployed in months, not years. For the right sites, we also develop larger co-located capacity.
Grid interconnection alone can take 2+ years. Traditional site development timelines don't match the pace AI infrastructure needs to scale. LandUp takes a different path.
Each piece is proven technology. The value is in how we combine them and where we place them.
Grid-connected or behind-the-meter generation — whichever path gets a site to energized faster. Dedicated capacity, matched to the location.
Factory-built, AI-ready compute modules with integrated cooling, power distribution, and monitoring. Rack-ready on delivery. Scale by adding modules.
Every site is screened for power availability, fiber connectivity, environmental clearance, and zoning before we commit. No surprises downstream.
Four stages. Built to move fast.
Latency requirements, MW size, target markets. We start with what the compute actually needs.
Grid-connected or behind-the-meter — matched to the requirement and the fastest path to power.
Gas or grid power, fiber, and permitting locked in before construction starts.
Modular data center infrastructure installed onsite and energized — typically 6-12 months from agreement to power-on.
Every LandUp project is a three-way win.
Need low-latency capacity across multiple markets — typically under 50 MW — faster than the grid allows. Tell us the location, size, and timeline.
You have open land in the right location. We turn it into a revenue stream — structured as a ground lease with long-term contracted income — with no capital required from you.
Companies with gas, generation, or grid interconnection capabilities looking to partner on deployment.