127th Street Industrial Site

127th Street, south Chicago, IL · Little Calumet River

Land and building21 acres175,355 SF buildingREPORTED
Potential total power150+ MWEstimated, from utility talksREPORTED
Time to first power2.5 to 4 yearsVia an on-site 138 kV substationESTIMATE
First power4.5 MW or lessExisting service todayREPORTED
The opportunity

Overview

A former steel coil plant on about 21 acres close to a 138 kV transmission line: 175,000 SF, 44 ft clear, rail into the building and overhead cranes. A fast-moving site with a defined power route: an on-site substation off the nearby line.

Key facts

Land and building
About 21 acres · 175,355 SFREPORTED
Potential total power
Estimated over 150 MW at 138 kV, from conversations with the utility (not confirmed in writing); a first phase under 50 MWREPORTED
Time to first power
About 2.5 to 4 years via an on-site 138 kV substation; transformers alone take about 2.5 yearsESTIMATE
First power
Existing service of about 4.5 MW or less on site today (two 2,500 kVA transformers); the utility cannot reserve itREPORTED

LandUp's view

Our view

This is a fast-moving site. Our recommendation is a cash purchase at about $8M, then an on-site 138 kV substation fed from the nearby transmission line. Plan for $15M to $35M and 2.5 to 4 years for that substation. ESTIMATE

Why it can work

A 138 kV line runs about 0.1 mi from the site and a 138 kV substation sits about 0.7 mi away. We have engaged the utility on the service path. REPORTED

What stands in the way

The utility told us existing feeder capacity has likely been absorbed and cannot be reserved. About 45 MW on distribution feeders would take 2+ years and new 34 kV lines. REPORTED

Power

Existing service
8,000 A at 480 V of switchboard (about 6.6 MVA ceiling) behind two 2,500 kVA pad-mount transformers (5 MVA, about 4.5 MW)VERIFIEDNameplates and flyer, site visit Oct 15 2026
Route to scale
On-site 138 kV customer substation from the adjacent line, designed under 50 MW to avoid a larger load studyESTIMATE
Utility conversations
Our conversations with the utility point to over 150 MW being possible at 138 kV; written confirmation is pendingREPORTED
Line capacity
About 200 MW reported on the 138 kV line; whether that is rating or real headroom is unconfirmedREPORTED
Utility feeders
About 9 to 10 feeders (34 kV service) for 45 MW; nearest 34 kV substation about 4 mi; 2+ yearsREPORTED

Grid

Nearest substation
138 kV substation about 0.7 mi; 138 kV line about 0.1 mi; 138/345 kV substation about 2.5 miESTIMATE

Gas

Gas service
16,000 CFH meter with two regulators rated up to 60 psig inlet. Usage appeared low (vacant). Main pressure not confirmedVERIFIEDMeter and regulator nameplates, site visit Oct 15 2026
Capacity for generation
Meter size alone supports roughly 1.6 to 2.1 MW of generation if the utility delivers itESTIMATE

Fiber

Fiber
Two independent carriers' fiber handoffs seen at the buildingVERIFIEDEquipment seen at site visit Oct 15 2026

Building and land

Size
175,355 SF on about 21.15 acres; about 1,000 ft long; built 1996REPORTED
Clear height
44 ft over 129,750 SF; 35 ft over 45,605 SFREPORTED
Floor
12 in concrete slabREPORTED
Cranes
Overhead rail cranes, up to 40-ton; count differs between sourcesCONFLICT
Rail
Two spurs; about 600 ft of rail inside the buildingREPORTED
Doors
9 drive-in doors, 4 docksREPORTED
Environmental
Former steel coil processing; no Phase I seenUNKNOWN

Location

Location
127th Street, south Chicago, on the Little Calumet River; homes to the west, forest preserve beyond the riverREPORTED
Zoning
M3-3 industrialVERIFIEDCity of Chicago zoning data
Flood
Building is in the minimal-hazard zone; 100-year zone within 0.25 mi at the river edgeVERIFIEDFEMA flood map, Oct 15 2026

What is and is not established

Route to scale
On-site 138 kV substation off the adjacent lineESTIMATE
Utility capacity
Written confirmation pendingUNKNOWN
Environmental
Phase I not yet seenUNKNOWN

VERIFIED: seen in a document or on site by LandUp. REPORTED: told to us by the utility, an owner or a broker; not yet seen in a document. ESTIMATE: our estimate. CONFLICT: sources disagree. UNKNOWN: not yet established. Nothing on this page is a utility commitment or a development approval.