Potential total power10 MWOur target; ComEd is evaluating itREPORTED
Time to added powerAbout 12 monthsOur estimate for added power if lines have capacityESTIMATE
Existing power0.5 to 1 MWExisting service on site todayREPORTED
The opportunity
Overview
A three-level building with a basement near downtown Chicago, a short walk from a 138 kV substation and dense fiber. About 0.5 to 1 MW of existing service and a small gas service are on site, and ComEd is evaluating a 10 MW upgrade.
Key facts
Building
Three levels plus a basementVERIFIEDLandUp site visit
Potential total power
10 MW is our target. ComEd is evaluating the upgradeREPORTEDUtility service request on file
Time to added power
Our estimate is about 12 months if the nearby lines have capacity; longer if a new feeder is needed. The utility has not committed to a dateESTIMATE
Existing power
About 0.5 to 1 MW of service on site todayREPORTEDSwitchboard rating and utility call
LandUp's view
Our view
A dense downtown location with substations next door. The project turns on how soon the utility can add capacity and on city rules for data centers. ESTIMATE
Power
Utility review
ComEd is evaluating a 10 MW upgradeREPORTEDUtility service request on file
Today
About 0.5 to 1 MW of existing service on siteREPORTEDSwitchboard rating and utility call
Added power
The power lines are right beside the site. The question is whether the utility has capacity there; if it does, we estimate about 12 months, and a new feeder would take longerESTIMATE
City rules
A proposed city moratorium on new data centers and tighter generator and noise review are pendingREPORTED
Grid
Nearest substation
138 kV substation about 0.06 mi; 138/69 kV about 0.16 mi; 138/345 kV about 0.2 miESTIMATE
Gas
Gas
Gas service is on site; it is a small serviceVERIFIEDLandUp site visit
Fiber
Fiber
Dense downtown carrier presenceESTIMATE
Building and land
Levels
Three levels plus a basementVERIFIEDLandUp site visit
Structure
Structural drawings and floor loading not yet obtainedUNKNOWN
Roof
Roof capacity for cooling equipment not yet checkedUNKNOWN
Location
Location
West Loop, Chicago, IllinoisREPORTED
Flood
Minimal-hazard zone at the address and within 0.25 miVERIFIEDFEMA flood map, Oct 15 2026
Downtown district; proposed city moratorium pendingREPORTED
Fiber
Dense downtown carrier presenceESTIMATE
Structural
Drawings and floor loading not yet obtainedUNKNOWN
Environmental
Phase I not yet seenUNKNOWN